• <sup id="1zmse"><input id="1zmse"></input></sup>
          <label id="1zmse"><samp id="1zmse"></samp></label>
          <blockquote id="1zmse"></blockquote><label id="1zmse"></label>
          国产在线观看免费人成视频,国产欧美久久久精品影院,精品国产一区二区三区国产区,免费毛片在线播放中文,亚洲制服丝袜av一区二区三区,久久人搡人人玩人妻,国产一区二区四区不卡,亚洲夂夂婷婷色拍WW47
          您好,歡迎來(lái)到濟(jì)南通宇恒成自動(dòng)化工程有限公司網(wǎng)站!

          服務(wù)熱線

          常見(jiàn)問(wèn)題
          新聞中心

          電氣成套設(shè)備越級(jí)跳閘的主要情況如何?

          發(fā)布時(shí)間:2022-04-25 來(lái)源:http://www.cr4.com.cn/ 瀏覽量:

            電氣成套設(shè)備的使用避免不了問(wèn)題的出現(xiàn),提前做好預(yù)防工作有利于減少問(wèn)題的出現(xiàn),我們需要知道有哪些故障問(wèn)題會(huì)出現(xiàn),比如電氣成套設(shè)備越級(jí)跳閘的主要情況如何?
            The use of electrical complete equipment can not avoid the emergence of problems, do a good job of prevention in advance to reduce the emergence of problems, we need to know what fault problems will appear, such as the main situation of electrical complete equipment trip?
            主開(kāi)關(guān)負(fù)載容量小于分開(kāi)關(guān)負(fù)載總和的容量;主開(kāi)關(guān)有漏電保護(hù)裝置然而分開(kāi)關(guān)沒(méi)有,當(dāng)用電器漏電大于等于30毫安時(shí)主開(kāi)關(guān)跳閘;兩級(jí)電氣成套設(shè)備保護(hù)不匹配,盡量使用同的電氣成套設(shè)備;經(jīng)常帶負(fù)荷操作主開(kāi)關(guān)導(dǎo)致觸電碳化接觸不良后電阻增大電流升高發(fā)熱跳閘;下級(jí)電氣成套設(shè)備配置的保護(hù)無(wú)法正確判斷故障;電氣成套設(shè)備老化導(dǎo)致分勵(lì)脫扣時(shí)間變長(zhǎng),要更換一個(gè)分勵(lì)脫扣時(shí)間小于上一級(jí)開(kāi)關(guān)的分開(kāi)關(guān)。
            The load capacity of the main switch is less than the total load capacity of the separate switches. The main switch has leakage protection device but not separated off, when the use of electrical leakage is greater than or equal to 30 ma when the main switch trip; Two levels of complete electrical equipment protection does not match, try to use the same brand of complete electrical equipment; Often with load operation of the main switch lead to electric carbonization contact poor resistance increases current increases heat trip; Failure can not be correctly judged by the protection of subordinate complete electrical equipment configuration; The aging of the complete electrical equipment causes the shunt trip time to be longer. Replace a shunt trip whose time is shorter than the split switch of the previous level.
            如發(fā)生上級(jí)電氣成套設(shè)備越級(jí)跳閘,若查明有分路保護(hù)動(dòng)作,但該分路電氣成套設(shè)備未跳閘,則分?jǐn)嘣摷?jí)電氣成套設(shè)備,然后恢復(fù)上級(jí)電氣成套設(shè)備;若查明各分路保護(hù)均未動(dòng)作,則應(yīng)檢查停電范圍內(nèi)設(shè)備有無(wú)故障,若無(wú)故障可合上上級(jí)電氣成套設(shè)備,并逐一試送各分路電氣成套設(shè)備。當(dāng)送到某一分路時(shí)電源電氣成套設(shè)備又再跳閘,則可判明該電氣成套設(shè)備為故障電氣成套設(shè)備,可對(duì)該線路進(jìn)行隔離維修更換。
            In case of grade-exceeding trip of superior complete electrical equipment, if it is found that there is shunt protection action, but the shunt complete electrical equipment does not trip, the electrical complete set of the same level shall be cut off, and then the superior complete electrical equipment shall be restored; If it is found that none of the shunt protection works, it should be checked that there is no fault within the scope of power failure. If there is no fault, the superior electrical complete set of equipment can be closed and each shunt complete set of electrical equipment can be tried one by one. When the power electrical complete set of equipment is sent to a branch and then trips again, it can be determined that the electrical complete set of equipment is faulty electrical complete set of equipment, and the line can be isolated, repaired and replaced.
            電氣成套設(shè)備要跳閘須符合兩個(gè)條件,一是故障電流大小達(dá)到設(shè)定值,二是故障電流持續(xù)時(shí)間達(dá)到設(shè)定的時(shí)間長(zhǎng)度,所以要確保電氣成套設(shè)備不越級(jí)跳閘須在電流設(shè)定值和時(shí)間設(shè)定值上配合好。要確保不越級(jí)跳閘須用繼保設(shè)備測(cè)試電氣成套設(shè)備的實(shí)際動(dòng)作時(shí)間總長(zhǎng),用實(shí)際試驗(yàn)結(jié)果的時(shí)間長(zhǎng)度來(lái)確保配合的正確。
            Tripping of complete electrical equipment must meet two conditions, one is the fault current reaches the set value, the other is the fault current duration reaches the set time length, so to ensure that the complete electrical equipment does not skip the trip, it must cooperate well in the current set value and time set value. To ensure that there is no leap-step trip, it is necessary to test the total actual operation time of complete electrical equipment with follow-up equipment, and ensure the correct coordination with the time length of actual test results.
            電氣成套設(shè)備越級(jí)跳閘的主要情況如何?以上便是問(wèn)題的相關(guān)解答了,如果您對(duì)此有疑問(wèn)的話可以通過(guò)網(wǎng)站www.cr4.com.cn聯(lián)系到我們,人員在線為您解惑!
            What is the main situation of grade-jumping trip of complete electrical equipment? The above is the relevant answer to the question, if you have any questions about this, you can contact us through the website www.cr4.com.cn, professional online for you to solve the doubts!
          首頁(yè)首頁(yè) 產(chǎn)品產(chǎn)品 電話電話 置頂置頂
          主站蜘蛛池模板: 亚洲欧美精品水蜜桃| 日韩理论午夜无码| 亚洲av成在线观看| 一个人看的片免费高清WWW| 亚洲人成网站色www| 国产卡一卡二卡三无线乱码新区| 欧美成精品视频播放| 国产综合精品一区| 最新国产成人ab网站| 午夜成人无码免费看试看| 18禁高潮出水呻吟娇喘色哟哟 | 欧美精品欧美人与动人物牲交| 久草中文在线| 黑人狂桶女人高潮嗷嗷叫小说| 免费国产在线精品二区| 国产精品黑色丝袜在线观看| 天堂在线中文网| 国内外精品激情刺激在线| 成人无码无遮挡很h在线播放| 久草视频在线新免费| 欧美交换配乱吟粗大| 特级做a爰片毛片免费看108| 国产精品白丝av网站| 亚洲国产亚洲天堂| 国产交换配偶在线视频| 无码超级大爆乳在线播放| 亚洲区小说区图片区qvod| 国产三级黄色的在线观看| 久草手机在线一本视频| 自拍偷亚洲产在线观看| 亚洲欧美综合国产精品| 日本国产制服丝袜一区| 精品99一卡2卡三卡4卡| 在线亚洲人成电影网站色| 久久久久精品国产亚洲av电影| 天天做天天爱夜夜爽女人爽| 99国产精品人妻噜啊噜| 国产高欧美性情一线在线| 超91福利国产在线观看| 精品无码国产一区二区三区在线看 | 国产精品青草久久久久|